All fastening nails were 1 3 4 x 0 135 ring shank roofing nails.
Smacna roof flashing details.
Architectural sheet metal manual 6th edition figure 3 23.
View this publication in the store.
Flashing a nail flange window 2018 rev detail.
Never attach any roof flashing directly to rooftop unit.
A custom sheet metal contractor who installs a packaged roof system can provide custom detailing and job specific flashing that will greatly enhance the roof s overall weather tightness.
Sheet metal and air conditioning contractors national association 4201 lafayette center drive chantilly virginia 20151 1219 tel 703 803 2980 fax 703 803 3732.
The details included here establish the best known methods of installation for rooftop mounted equipment.
The 12 inch gravel stop sections were cut at random which allowed the tests to be conducted with either 3 or 4 nails through the pre punched holes.
For details not included in this manual refer to the latest edition of the smacna architectural sheet metal manual.
The detail shows the method of flashing the head of a standing seam shed roof.
Benefits of sheet metal.
Applies to commercial industrial and residential buildings.
Read me first sma guide details caveat.
Roofing and waterproofing manual 5th edition detail asph 2.
Asphalt roofing residential manual.
Refer to the details.
Demanding conditions on the roof.
Smacna expresses appreciation to the committees and task forces architects.
Direct reference to this manual by figure or detail number is encouraged.
The standing seams are laid flat 8 from the vertical wall folded 3 4 and secured with copper cleats spaced 12 o c.
Attached to a pressure treated s p f roof edge mock up utilizing a 0 042 thick reinforced tpo roofing membrane.
Also covers flashing metal roofs copings gravel stop fascia.
Include roof pitch roof geometry slope length and climatic factors such as heavy snowfall or rainfall.
Copper locking strips of the same weight as the flashing are soldered to the pans between seams at least 6 from the wall and engage the base flashing in a 3 4 lock.
Wall to roof deck flashing 2020 detail.
Control joint at floor line 2016 detail.
Kick out flashing for stucco 2019.
An upfront fast look up key speeds information retrieval.
Includes wind uplift pressure test reports confirming superior performance of custom fabricated metal roofing.
Smacna architectural sheet metal manual 7th edition.
Whenever possible begin trim installation at the downwind end of the roof farthest away from the source of prevailing winds to al low flashing laps to face away from wind driven rain.
Weep screed for stucco 2020 detail.
The concealed barrier assembly 2016 detail.
Recommended vertical height of step flashing.