X 1 1 2 in flush with bottom edge of sill plate.
Smart siding shake installation instructions.
Do not overdrive nails.
Starting from left to right level and install the first course of siding so random edge is no more than 1 2 in.
You will want to use a starter shim that is roughly 1 wide and thick.
1 for windows vinyl siding and metal accessories.
Use housewrap flashing tape z flashing or other items.
How to install lp smartside trim siding.
Begin by nailing a starter strip approximately 3 8 in.
Fasten the siding at each stud according to the following steps.
Smartside siding instructions wall preparation.
Installation guide download for more than 75 years ply gem residential solutions has led the industry with a portfolio that is unmatched.
For random drip edge.
Nail head should seat firmly to face of siding but not be overdriven to distort the siding surface.
Composite exterior cladding materials siding have gained more popularity over the past 20 years as they provide a high end look are paintable and more impact resistant than traditional siding materials like vinyl and aluminum.
With four components of protection the process adds strength and helps our products withstand impacts freeze thaw cycles high humidity fungal decay and termites.
Shim siding at studs as needed to avoid drawing siding against uneven walls.
Sensitive to moisture smartside siding requires proper wall preparation to protect it from moisture.
Install kick out flashing to direct the water into the gutter install step flashing with minimum 4 in.
Vertical butt joints must fall on studs.
As in standard construction practices install smartside siding by nailing to studs spaced 16.
Overlap successive courses of siding a minimum of 1 in.
Lp smartside trim siding products are treated with our proprietary smartguard process.
Contractors watch this video to learn about the advantages of using lp smartside trim siding products and how to install them.
However a significant amount of the installations i see in the field are incorrect per the manufacturer s.
Install cedar shakes on stud spacing no greater than 16 on center.